CEDAR DESK RETURNS PILOT — FICTIONAL SOURCE Audience: operations leads Decision requested: approve a two-week pilot on 1–14 December 2026. Scope: Desk A and Desk B. Target of 60 eligible return tickets. Baseline: 18 of 60 tickets lacked a condition note in a historical sample. Success threshold: no more than 6 of 60 pilot tickets without a condition note. Estimated spend: $360. Spending ceiling: $500. Owner: Avery Lin. Reviewer: Sam Ortiz. Dependency: supervisor sign-off before kickoff. Sign-off is pending. Risk: part-time staff may miss the change. Mitigation: include the two-minute checklist at shift handoff. No pilot results are available. This brief makes no savings estimate. WORD PROMPT Use only the Cedar Desk Returns Pilot brief above. Create an editable one-page Word report for operations leads. Cover decision requested, scope, baseline, target, spending estimate and ceiling, ownership, and the pending sign-off. Include the stated risk and mitigation. Label the project fictional and do not imply it has started. Do not estimate savings. POWERPOINT PROMPT Use the same original Cedar Desk Returns Pilot brief above. Create an editable four-slide deck. Slide 1: decision requested and proposed dates. Slide 2: scope, baseline and success criterion. Slide 3: cost, risk and mitigation. Slide 4: owner, reviewer and pending sign-off. Add short presenter notes if supported. Do not imply approval, report pilot results or estimate savings. REVIEW Word and slides must agree on the dates, 60-ticket scope, 18/60 baseline, at most 6/60 target, $360 estimate, $500 ceiling and pending sign-off. If the draft adds percentages, check 18/60 = 30% and 6/60 = 10%.